Project Delay Factor Ranking among Contractor, Client and Project Management Consultant in Construction Industry

Ade Asmi, Aurino RA Djamaris

Abstract


A construction project delay can result in financial losses to various parties involved both to the Contractor, Client and Project Management Consultant (PMC). This paper presents the results of a survey questionnaire conducted among Contractors, Clients and PMC. Data was analyzed with statistical tools to rank factors that influenced construction delays. From the results of the analysis there were 58 project delay factors that affected the delay of construction projects based on previous research. The project delay factors ranked so as to produce a project delay ranking sequence. Project delay factors will be grouped based on the perception of the Contractor, Client and PMC. Each project delay factor will be analyzed based on the type of delay factor, namely: Finance; Technical; and Coordination. It is concluded that the type of delay factor "finance" is a problem causing the project delay according to the perception of the "Client". While the type of "Technical" delay factor is the dominant cause of involvement according to the Contractor and PMC. For the type of delay factor "Coordination" is the main consideration for the cause of the project delay for the Contractor.

 

 

Keywords


Delay factors, Contractor, Consultant, PMC, Construction

Full Text:

PDF

References


Ameh, O. J., A. A. Soyingbe, and K. T. Odusami. 2010. "Significant factors causing cost overruns in telecommunication projects in Nigeria." Journal of Construction in Developing Countries 15.

Asmi, Ade, Aurino Djamaris, and Mohammad Ihsan. 2019. "Top Ten Similarity Ranking for Project Delay Factors in Construction Industry, First International Conference of Construction, Infrastructure, and Materials,." IOP Conf. Series: Materials Science and Engineering. Jakarta: IOP Publishing. 1-7. doi:10.1088/1757-899x6501012006.

Asmi, Ade, Jouvan Chandra Pratama, and Safrilah. 2016. "Identifikasi Faktor-Faktor Keterlambatan Dalam Proyek Konstruksi di Jakarta." SEMNASTEK Fakultas Teknik Universitas Muhammadiyah Jakarta. Jakarta: Fakultas Teknik Universitas Muhammadiyah Jakarta.

Azhar, N., R. U. Farooqui, and S. M Ahmed. 2008. "Cost overrun factors in construction industry of Pakistan." The first international conference on construction in developing countries (ICCIDC-I) "Advancing and Integrating Construction. Pakistan: ICCIDC.

Chan, DWM, and M M Kumaraswamy. 1997. "A Survey of time-cost relationship in Hong Kong construction projects 1993-1994." Building Technology and Management Journal. Kuala Lumpur: School of Technology, Tunku Abdul Rahman College.

Enshassi, A, Lisk, R, Sawalhi, I., and I Radwan. 2003. "Contributors to construction delays in Palestine." The Journal of American Institute of Constructors, 27(2) 54-53.

Kaliba, C., M. Muya, and K. Mumba. 2009. "Cost escalation and schedule delays in road construction projects in Zambia." International Journal of Project Management, 27 522-531.

Le-Hoai, L., Y. D. Lee, and J. Y. Lee. 2008. "Delay and cost overruns in Vietnam large construction projects: A comparison with other selected countries KSC Journal of Civil Engineering." KSCE J Civ Eng 12 367–377.

Male, S. 2008. "Faster Building for Commerce: NEDO (1988). In Construction Reports 1944–98 (eds M. Murray and D. Langford)." ch10. doi:10.1002/9780470758526.

Meepol, S., and S.O. Ogunlana. 2006. "Factors affecting cost and time performance on highway construction projects: evidence from Thailand. ;." Journal of Financial Management of Property and Construction 11(1) 3-20.

Rwelamila, P.D., and K.A. Hall. 1995. "Tool systems intervention: an integrated approach to time, cost and quality management." Construction Management and Economics, 13 235-241.




DOI: https://doi.org/10.36262/widyakala.v8i2.389

Refbacks

  • There are currently no refbacks.


Copyright (c) 2021 WIDYAKALA: JOURNAL OF PEMBANGUNAN JAYA UNIVERSITY

Creative Commons License
This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.


Redaksi Jurnal Widyakala
Lembaga Penelitian dan Pengabdian Kepada Masyarakat (LP2M)
Universitas Pembangunan Jaya
Jalan Cendrawasih Raya Blok B7/P, Sawah Baru, Ciputat, 15413
Telp : 021-7455555 ext 1311
widyakala.journal@upj.ac.id